The reason for this was that the damage to the main pipe had damaged a smaller pipe next to the main pipe. The cement drinking water supply pipe was unable to withstand the pressure. A tap stand with drinking water had been set up for those affected. The pipe is to be repaired during the course of the day. The repair of the large pipe will take several weeks, said Hackenesch-Rump. Due to the break in the main pipe, large parts of the north-east of the capital were temporarily without water during the night.